Was the first job done by Nederhoff and Peinemann, this time Sarens was called to hoist an installation part.
The used equipment are a Terex AC 700 and a Terex AC 500-2.
The cranes are fitted with 120 tonnes of counterweight for the AC 700 and 160 tonnes for the AC 500-2.
The AC 500-2 has the boom extended 24 metres, the AC 700 is doing the job with 30.5 metres of boom.
The turbine of about 130 tonnes is hoisted out of the ship here.
And set on the platform trailer of principal Wagenborg Nedlift. They are driving again with a MAN TGX 41.680.