A specially modified Liebherr HS 853 HD of Zwagerman VMT from Nederhorst den Berg (NL).
The crane is fitted with an extremely short (and low) boom that makes it possible to work below an overpass.
That for a new railway tunnel near to Utrecht (NL). The other slurry wall work was done by Franki.
It is a 90 tonne crane with 24 tonnes of counterweight and a tailswing of 4.6 meters.
The slurry wall grab was also very small.
The specially made boom head is developed by Eurorigging.
It was a pity that day wasn't worked.